Animo Westside
Middle School Los Angeles, California Architect: Osborn Structures: 1. Gravity: The existing floor and roof are open-web joists supported by steel/wood posts and masonry/wood walls. New floor/deck extension is concrete fill over metal deck supported by steel framing. New roof over floor/deck extension is sawn lumber wood joists and beams. 2. Lateral: New concrete filled deck properly tied to existing wood diaphragm laterally supported by new reinforced concrete shear walls, reinforced CMU shear walls, and existing reinforced masonry shear walls. Status: Completed in 2014. * Worked as project manager in previous firm. |